AndonAI

Agent War Room

Multi-agent analysis coordination and decision support

Blocked Emergency Exit — Zone A-7

Pallets and equipment cart obstructing designated emergency exit in warehouse Zone A-7. Exit door inaccessible and exit signage partially obscured. Critical fire safety violation requiring immediate clearance.

criticalactive
Warehouse Zone A-7
Jun 2, 11:43 AM
Very High (95%)
Marcus Chen

Agent Analysis Pipeline

6 agents deployed

Watcher Agent

watcher1200ms
96%
confidence

Visual anomaly detected in Zone A-7 camera feed. Large objects identified obstructing designated emergency exit path. Object classification: pallets (3), equipment cart (1).

Evidence Used
Camera feed Zone A-7Object detection model

Interpreter Agent

interpreter1800ms
94%
confidence

Emergency exit in Zone A-7 is fully blocked by stacked pallets and a maintenance cart. The exit door is not accessible and the illuminated exit sign is partially obscured. This represents a critical fire safety violation.

Evidence Used
Watcher Agent outputSpatial analysisExit signage detection

SOP Agent

sop950ms
97%
confidence

Matched to SOP-FS-001: Fire Safety & Emergency Egress, Section 4.2 — Emergency exits must remain clear at all times with minimum 44-inch clearance. Also relevant: OSHA 29 CFR 1910.37(a)(3). Current state is non-compliant.

Evidence Used
SOP-FS-001OSHA 1910.37Clearance measurement

Root Cause Agent

root-cause2200ms
87%
confidence

Root cause analysis indicates receiving overflow from morning delivery (PO-2847) exceeded staging area capacity. Pallet staging protocol was not followed. Contributing factor: reduced staging area due to ongoing Zone A-6 renovation.

Evidence Used
Delivery log PO-2847Zone A-6 renovation scheduleStaging area capacity records

Dispatcher Agent

dispatcher800ms
95%
confidence

Severity: CRITICAL. Assigned to Safety Lead (Primary) and Warehouse Supervisor (Secondary). Immediate action required within 15 minutes. Escalation to Plant Manager if unresolved in 30 minutes.

Evidence Used
Severity matrixPersonnel rosterEscalation policy

Report Agent

report1500ms
93%
confidence

Audit report INC-2025-0147 generated. Classification: Critical Fire Safety Violation. Evidence package includes camera captures, SOP references, delivery logs, and corrective action timeline. Report is compliance-ready for OSHA and internal safety audit.

Evidence Used
All agent outputsIncident templateCompliance checklist

Final Decision & Recommended Action

Root Cause

Receiving overflow from morning delivery (PO-2847) exceeded staging area capacity. Pallet staging protocol was not followed due to reduced staging area from Zone A-6 renovation.

Corrective Action

Immediately clear all obstructions from emergency exit path. Verify 44-inch minimum clearance. Re-inspect exit signage illumination. File safety violation report.

Preventive Action

Install physical bollards to prevent staging near exits. Add daily exit clearance check to zone audit. Review receiving overflow protocol for peak delivery periods.

Escalation Path

Marcus Chen (Safety Lead) → Operations Manager → Plant Director

SOP References

SOP-FS-001Section 4.2SOP-WH-004Section 3.1